Interview for vacation work

January was a long month and I was itching to get on site and just be one with the dust and noise. So as it is I went out searching for opportunities. This was at a time where there were many construction projects happening on site.

One thing I learnt from attending online webinars is the art of putting yourself out there and being a Brand.

This landed me my first on site opportunity for the year. i had an interview for the position on the 3rd of February and a few days later I was on the road to success.

Tutoring

In enjoyed QS so much that I would find different ways to explain and understand. I used this to assist my peers. So when the opportunity came I thought it was a good idea

I made it as a tutor for the ASAQS

In preparation for exams we spent the day preparing and later had an online session

Site visit

After a while of not being able to go on site today I got an opportunity to do so. I spent the day doing admin work with the construction manager. This allowed me the opportunity to see what happens behind the scenes on site

A lot of progress has been made

I’m super proud

Cost

After some time of evaluating costs it wasn’t wise go for a slab roof which would also be the first floor therefore the contractors and engineers decided on a roof called rib and block. As illustrated in the picture below. Timber supports are placed underneath in perpendicular direction to the rib. The ribs are lying in a row forming columns. In betweeen the columns are the blocks. Concrete blocks which are cheaper to purchase